EVS Case History
 

A foundry in the Midwestern USA has two 12.5 MT, high powered medium frequency furnaces for melting ductile iron at 1500°C.  Typical campaigns were four weeks and 4,000 MT using MINRO-SIL® RAM 1001, 0.8% Boron Oxide.  Installations were done using a pneumatic internal form vibration system (high frequency).  The total reline time including lining the spout and the back slagger with plastic, plus the floor and sidewall took 6 people 9 hours to complete.    This foundry converted to MINRO-SIL 2001® and achieved 6,000 MT campaigns using the same installation equipment.
 

Now using the EVS, the total reline takes 4.5 hours with 3 people.  The packaging was changed to 1 MT bulk bags.  The refractory campaigns now last an average of ten weeks or 10,000 MT.
 

End result:  Labor reduced by 50%.
                   Installation time reduced by 50%.
                   Refractory campaigns have doubled.

 

Call today for more information!
614-876-0244

Ask for the EVS Representative.
sales@alliedmin.com

 

        Home     Affiliates/Divisions     Markets Served     News     Products    

Featured Products     Links    Employment    Contact Us

 
Send questions or comments about this web site to the Webmaster.
Copyright © 2008 Allied Mineral Products, Inc.
Legal Notice
Last modified: June 06, 2008